Yeaaaa! Reliant gets a new bathroom with a luxory shower, hot water and all the plumber work well done.
Can you see the diferent?
Welcome to our Logbook, here you can find our latest Project Progress and Archiv
Donnerstag, 30. Mai 2013
Bathroom
Sonntag, 26. Mai 2013
engine again
Now its done, the engine room bilge is fineshed and the engine in its place again. A big job and we are so happy that one of the horribles works is ended. The new draining sump will avoid unwanted water acumulation down in the bilge. The green look now is completely :-)
Kitchen
The kitchen furniture is back an its place. The fridge is reconditioned with a new draining system and all the water instalation with hoses and valves are remaid. The old and leaky "feed" water tank is replaced by a branbd new 100l polietilen tank, mounted in the center bilge.
A special warm welcome to our star cook Eddi: you can start to roast the steaks!!!!!
A special warm welcome to our star cook Eddi: you can start to roast the steaks!!!!!
Samstag, 18. Mai 2013
Engine room
Now its time to start the engine service and by the way give the bilge below a better lock. Hard worke and not so funny we think until we start
Dienstag, 7. Mai 2013
Anchor winch
Another technical detail has finished. The anchor winch a true veteran got a lot of new components. Now it works like a new one. Hope so for a long time.
Montag, 6. Mai 2013
Salon floor
We start the woodworks. the salon floor is already done. Finally the acrobatic movements in the living area stops and we can step normal by the boat.
Freitag, 3. Mai 2013
Bilges
At least we finish the the reform of the bilge. Definitively the worst work in all the refit. What a difrent!!!
Abonnieren
Posts (Atom)